I rang ETSA (Electricity Trust of South Australia) today to give them the code to open the automated front gate on our yard. ETSA own all of the power infrastructure in South Australia and with the impending installation of our rooftop PV system we need an import/export power meter to get paid for any power we feed back into the grid. I wasn’t expecting the meter changeover any time soon as all the research I had done had suggested a 2-3 month install time. Colour me surprised when I rang to give them the gate entry code as they said they could come do the changeover next Wednesday! Part of me doesn’t believe this is actually possible but we shall wait and see. Mental note to self, turn off all power points next Wednesday before going out for day just in case.